When the cooling system’s installation has been completed, it is necessary to start the cooling tower and place it in service. Condenser water system commissioning can be broken down into the following basic elements, with numerous requirements associated with each element, outlined as follows:

A. Condenser Water Pump 1. Check pump installation, including mountings, vibration isolators

and connectors, and piping specialties (valves, strainer, pressure gauges, thermometers, etc.).