ABSTRACT

As a result, if products with relatively longer operation times are successively introduced into the line, the products will cause a delay in completing the product and may cause line stoppage. ™erefore, a heuristic program can be developed for the assembly line model-mix sequencing problem to minimize risk of stopping the conveyor (for example, see Okamura and Yamashina [1979]).