ABSTRACT

Two types of e-kanban are used: one (called earlier-replenishment e-kanban) is a method relating to the sequenced withdrawal of parts in accordance with the nal vehicle loading sequence schedule; the other (called later-replenishment e-kanban) is the conventional outsourcing kanban method. ™e two types of kanban are explained below.