ABSTRACT

Some performance-based procedures were developed for the design and maintenance phases among the three phases of design, construction and maintenance in Japan. For the construction phase, however, generally the specification-based procedures in which all the sampled values of volume, size, quality, etc. of the construction work must satisfy the criteria at inspection have been adopted. Accordingly, the inspection results are either acceptable or unacceptable, and an interim result does not usually exist.