ABSTRACT
To deal with the constraint that Smj=1, introduce the Lagrange multiplier ? and
minimize
In this last equation, I have switched the order of summation and integration and defined the quantities Pjk by
To deal with the constraint that Smj=1, introduce the Lagrange multiplier ? and
minimize
In this last equation, I have switched the order of summation and integration and defined the quantities Pjk by