ABSTRACT

This paper addresses the demand on the TBM design for the project Galleria Sparvo based on the prevailing conditions such as alternating geology comprising rock mass and slope deposits and the possibility of encountering gas deposits within the rock mass. The experiences that have been faced during tunnelling the first section with the largest EPB Shield (excavation diameter of 15.62 m) will be highlighted.