ABSTRACT
ABOVE GROUND DRAINAGE Soil and waste Point 320.00 to 390.00
5.4 Water Installations
WATER INSTALLATIONS Cold Water Point 320.00 to 390.00 Hot Water Point 365.00 to 445.00
PIPEWORK
HOT AND COLD WATER
Excludes insulation, valves and ancillaries, etc.