ABSTRACT

Case 6.1: Getting a Senior Wafer Fabrication Engineer’s Life Stabilized The project was to set up a new 6″ wafer fabrication for computer disk drive heads into production. I had an engineer assigned to every piece of equipment in the new wafer factory. They were tasked for sourcing the equipment, qualifying the equipment, and optimizing that particular equipment’s process for the computer disk drive head specifications using design of experiments. The project was fast paced with a duration of six months.