ABSTRACT

If a static GPS control survey is carefully planned, it usually progresses smoothly. The technology has virtually conquered two stumbling blocks that have defeated the plans of conventional surveyors for generations. Inclement weather does not disrupt GPS observations, and a lack of intervisibility between stations is of no concern whatsoever, at least in postprocessed GPS. Still, GPS is far from so independent of conditions in the sky and on the ground that the process of designing a survey can now be reduced to points-per-day formulas, as some would like. Even with falling costs, the initial investment in GPS remains large by most surveyors’ standards. However, there is seldom anything more expensive in a GPS project than a surprise.