ABSTRACT

An orthodox independent tied scaffold performs this duty satisfactorily, but it must be designed for two working platforms. One should be assumed to be loaded with debris to 3 kN/m2 (300 kg/m2, 60 lb/ft2), while the other should be assumed to be loaded to 1.5 kN/m2 (150 kg/m2, 30 lb/ft2).