ABSTRACT

Once the PV system has been sized as explained in Chapters 15 through 17, the installation may be planned. This means designing the physical layout of the system, selecting the proper equipment to meet the design requirements and ordering the different pats. In this chapter, criteria and guidelines for the design of a proper layout and selection of equipment available on the market are provided.