One coat of primer on wood surfaces exceeding 300mm girth m2 0.16 1.92 0.52 0.37 2.81 not exceeding 150mm girth m 0.04 0.48 0.09 0.09 0.66 150-300mm girth m 0.06 0.72 0.17 0.13 1.02 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.26 0.22 1.68 One coat of primer on metal surfaces exceeding 300mm girth m2 0.16 1.92 0.67 0.39 2.98 not exceeding 150mm girth m 0.04 0.48 0.11 0.09 0.68 150-300mm girth m 0.06 0.72 0.21 0.14 1.07 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.33 0.23 1.76 One coat of wood preservative on wood surfaces
exceeding 300mm girth m2 0.14 1.68 0.34 0.30 2.32 not exceeding 150mm girth m 0.03 0.36 0.09 0.07 0.52 150-300mm girth m 0.05 0.60 0.13 0.11 0.84 isolated areas not exceeding 0.5m2 nr 0.08 0.96 0.17 0.17 1.30
One coat of emulsion paint on brickwork or blockwork walls m2 0.20 2.40 0.65 0.46 3.51 brickwork or blockwork walls in staircase areas m2 0.26 3.12 0.65 0.57 4.34 plastered walls m2 0.12 1.44 0.43 0.28 2.15 plastered walls in staircase areas m2 0.16 1.92 0.43 0.35 2.70
UnitHours Hours £
Mat’ls £
O & P £
Total £
plastered ceilings m2 0.20 2.40 0.43 0.42 3.25 plastered ceilings in staircase areas m2 0.24 2.88 0.43 0.50 3.81 embossed papered walls m2 0.16 1.92 0.54 0.37 2.83 embossed papered walls in staircase areas
m2 0.20 2.40 0.54 0.44 3.38
Two coats of emulsion paint on
On internal woodwork
staircase areas
plastered walls m2 0.16 1.92 0.90 0.42 3.24 plastered walls in staircase areas m2 0.20 2.40 0.90 0.50 3.80 plastered ceilings m2 0.24 2.88 0.90 0.57 4.35 plastered ceilings in staircase areas m2 0.28 3.36 0.90 0.64 4.90 embossed papered walls m2 0.24 2.88 1.09 0.60 4.57 embossed papered walls in staircase areas
m2 0.26 3.12 1.09 0.63 4.84
One mist coat and two coats of emulsion paint on
brickwork or blockwork walls m2 0.36 4.32 1.63 0.89 6.84 brickwork or blockwork walls in staircase areas
m2 0.40 4.80 1.63 0.96 7.39
plastered walls m2 0.24 2.88 1.09 0.60 4.57 plastered walls in staircase areas m2 0.28 3.36 1.09 0.67 5.12 plastered ceilings m2 0.32 3.84 1.09 0.74 5.67 plastered ceilings in staircase areas m2 0.36 4.32 1.09 0.81 6.22 embossed papered walls m2 0.30 3.60 1.36 0.74 5.70 embossed papered walls in staircase areas
m2 0.34 4.08 1.36 0.82 6.26
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat sealer primer, one undercoat and one coat gloss on
plastered walls m2 0.42 5.04 1.30 0.95 7.29 plastered walls in staircase areas m2 0.46 5.52 1.30 1.02 7.84 plastered ceilings m2 0.48 5.76 1.30 1.06 8.12 plastered ceilings in staircase areas m2 0.52 6.24 1.30 1.13 8.67
One coat primer on wood general surfaces exceeding 300mm girth m2 0.18 2.16 0.54 0.41 3.11 not exceeding 150mm girth m 0.04 0.48 0.09 0.09 0.66 150-300mm girth m 0.06 0.72 0.17 0.13 1.02 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.26 0.22 1.68 One coat primer on wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.35 4.20 0.19 0.66 5.05 panes area 0.1 to 0.5m2 m2 0.30 3.60 0.17 0.57 4.34
One coat primer on wood frames, linings, skirtings and the like
exceeding 300mm girth m2 0.20 2.40 0.50 0.44 3.34 not exceeding 150mm girth m 0.05 0.60 0.07 0.10 0.77 150-300mm girth m 0.08 0.96 0.15 0.17 1.28 isolated areas not exceeding 0.5m2 nr 0.11 1.32 0.23 0.23 1.78
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat undercoat on primed wood general surfaces
exceeding 300mm girth m2 0.18 2.16 0.54 0.41 3.11 not exceeding 150mm girth m 0.04 0.48 0.09 0.09 0.66 150-300mm girth m 0.06 0.72 0.17 0.13 1.02 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.26 0.22 1.68 One coat undercoat on primed wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.35 4.20 0.21 0.66 5.07 panes area 0.1 to 0.5m2 m2 0.30 3.60 0.19 0.57 4.36 panes area 0.5 to 1m2 m2 0.25 3.00 0.17 0.48 3.65 panes area exceeding 1m2 m2 0.22 2.64 0.15 0.42 3.21 One coat undercoat on primed wood frames, linings, skirtings and the like
exceeding 300mm girth m2 0.20 2.40 0.54 0.44 3.38 not exceeding 150mm girth m 0.05 0.60 0.09 0.10 0.79 150-300mm girth m 0.08 0.96 0.17 0.17 1.30 isolated areas not exceeding 0.5m2 nr 0.11 1.32 0.26 0.24 1.82 Two coats undercoat on primed wood general surfaces
exceeding 300mm girth m2 0.36 4.32 1.09 0.81 6.22 not exceeding 150mm girth m 0.08 0.96 0.17 0.17 1.30 150-300mm girth m 0.12 1.44 0.34 0.27 2.05 isolated areas not exceeding 0.5m2 nr 0.20 2.40 0.52 0.44 3.36
UnitHours Hours £
Mat’ls £
O & P £
Total £
Two coats undercoat on primed wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.60 7.20 0.43 1.14 8.77 panes area 0.1 to 0.5m2 m2 0.50 6.00 0.39 0.96 7.35 panes area 0.5 to 1m2 m2 0.40 4.80 0.34 0.77 5.91 panes area exceeding 1m2 m2 0.30 3.60 0.30 0.59 4.49
exceeding 300mm girth m2 0.40 4.80 12.09 2.53 19.42 not exceeding 150mm girth m 0.10 1.20 0.17 0.21 1.58 150-300mm girth m 0.16 1.92 0.34 0.34 2.60 isolated areas not exceeding 0.5m2 nr 0.22 2.65 0.52 0.48 3.65 One coat gloss on undercoated wood general surfaces
exceeding 300mm girth m2 0.18 2.16 0.54 0.41 3.11 not exceeding 150mm girth m 0.04 0.48 0.09 0.09 0.66 150-300mm girth m 0.06 0.72 0.17 0.13 1.02 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.26 0.22 1.68 One coat gloss on undercoated wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.35 4.20 0.21 0.66 5.07 panes area 0.1 to 0.5m2 m2 0.30 3.60 0.19 0.57 4.36 panes area 0.5 to 1m2 m2 0.25 3.00 0.17 0.48 3.65 panes area exceeding 1m2 m2 0.22 2.64 0.15 0.42 3.21
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat gloss on undercoated wood frames, linings, skirtings and the like
exceeding 300mm girth m2 0.20 2.40 0.54 0.44 3.38 not exceeding 150mm girth m 0.05 0.60 0.09 0.10 0.79 150-300mm girth m 0.08 0.96 0.17 0.17 1.30 isolated areas not exceeding 0.5m2 nr 0.11 1.32 0.26 0.24 1.82 One coat primer, one coat undercoat and one coat gloss on wood general surfaces
exceeding 300mm girth m2 0.54 6.48 1.63 1.22 9.33 not exceeding 150mm girth m 0.12 1.44 0.26 0.26 1.96 150-300mm girth m 0.18 2.16 0.52 0.40 3.08 isolated areas not exceeding 0.5m2 nr 0.30 3.60 0.78 0.66 5.04 One coat primer, one coat undercoat and one coat gloss on wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.75 9.00 0.63 1.44 11.07 panes area 0.1 to 0.5m2 m2 0.60 7.20 0.47 1.15 8.82 panes area 0.5 to 1m2 m2 0.50 6.00 0.50 0.98 7.48 panes area exceeding 1m2 m2 0.40 4.80 0.43 0.78 6.01 One coat primer, one coat undercoat and one coat gloss on wood frames, linings, skirtings and the like
exceeding 300mm girth m2 0.60 7.20 1.59 1.32 10.11
On internal metalwork
isolated areas not exceeding 0.5m2 nr 0.33 3.96 0.76 0.71 5.43
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat primer, two coats undercoat and one coat gloss on wood general surfaces
exceeding 300mm girth m2 0.72 8.64 2.18 1.62 12.44 not exceeding 150mm girth m 0.16 1.92 0.34 0.34 2.60 150-300mm girth m 0.24 2.88 0.69 0.54 4.11 isolated areas not exceeding 0.5m2 nr 0.40 4.80 1.04 0.88 6.72 One coat primer, two coats undercoat and one coat gloss on wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 1.00 12.00 0.85 1.93 14.78 panes area 0.1 to 0.5m2 m2 0.80 9.60 0.76 1.55 11.91 panes area 0.5 to 1m2 m2 0.70 8.40 0.67 1.36 10.43 panes area exceeding 1m2 m2 0.60 7.20 0.58 1.17 8.95 One coat primer, two coats undercoat and one coat gloss on wood frames, linings, skirtings and the like
exceeding 300mm girth m2 0.80 9.60 2.13 1.76 13.49 not exceeding 150mm girth m 0.20 2.40 0.32 0.41 3.13 150-300mm girth m 0.32 3.84 0.67 0.68 5.19 isolated areas not exceeding 0.5m2 nr 0.44 5.28 1.02 0.95 7.25
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat primer on metal general surfaces
exceeding 300mm girth m2 0.18 2.16 0.59 0.41 3.16 not exceeding 150mm girth m 0.04 0.48 0.11 0.09 0.68 150-300mm girth m 0.06 0.72 0.19 0.14 1.05 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.30 0.23 1.73 One coat primer on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.35 4.20 0.21 0.66 5.07 panes area 0.1 to 0.5m2 m2 0.30 3.60 0.19 0.57 4.36 panes area 0.5 to 1m2 m2 0.25 3.00 0.17 0.48 3.65 panes area exceeding 1m2 m2 0.22 2.64 0.15 0.42 3.21
One coat primer on metal radiators exceeding 300mm girth m2 0.18 2.16 0.59 0.41 3.16 One coat undercoat on metal general surfaces
exceeding 300mm girth m2 0.18 2.16 0.54 0.41 3.11 not exceeding 150mm girth m 0.04 0.48 0.09 0.09 0.66 150-300mm girth m 0.06 0.72 0.17 0.13 1.02 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.26 0.22 1.68
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat undercoat on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.35 4.20 0.19 0.66 5.05 panes area 0.1 to 0.5m2 m2 0.30 3.60 0.17 0.57 4.34 panes area 0.5 to 1m2 m2 0.25 3.00 0.15 0.47 3.62 panes area exceeding 1m2 m2 0.22 2.64 0.13 0.42 3.19 One coat undercoat on structural steelwork
exceeding 300mm girth m2 0.24 2.88 0.54 0.51 3.93 One coat undercoat on metal radiators exceeding 300mm girth m2 0.18 2.16 0.54 0.41 3.11 Two coats undercoat on metal general surfaces
exceeding 300mm girth m2 0.18 2.16 1.09 0.49 3.74 not exceeding 150mm girth m 0.04 0.48 0.17 0.10 0.75 150-300mm girth m 0.06 0.72 0.34 0.16 1.22 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.52 0.26 1.98 Two coats undercoat on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.35 4.20 0.39 0.69 5.28 panes area 0.1 to 0.5m2 m2 0.30 3.60 0.34 0.59 4.53 panes area 0.5 to 1m2 m2 0.25 3.00 0.30 0.50 3.80 panes area exceeding 1m2 m2 0.22 2.64 0.26 0.44 3.34
UnitHours Hours £
Mat’ls £
O & P £
Total £
Two coats undercoat on structural steelwork
exceeding 300mm girth m2 0.24 2.88 1.09 0.60 4.57 Two coats undercoat on metal radiators exceeding 300mm girth m2 0.18 2.16 1.09 0.49 3.74
not exceeding 150mm girth m 0.04 0.48 0.09 0.09 0.66 150-300mm girth m 0.06 0.72 0.17 0.13 1.02 isolated areas not exceeding 0.5m2 nr 0.10 1.20 0.26 0.22 1.68 One coat gloss on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.35 4.20 0.19 0.66 5.05 panes area 0.1 to 0.5m2 m2 0.30 3.60 0.17 0.57 4.34 panes area 0.5 to 1m2 m2 0.25 3.00 0.15 0.47 3.62 panes area exceeding 1m2 m2 0.22 2.64 0.13 0.42 3.19 One coat gloss on structural steelwork exceeding 300mm girth m2 0.24 2.88 0.54 0.51 3.93 One coat gloss on metal radiators exceeding 300mm girth m2 0.18 2.16 0.54 0.41 3.11
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat primer, one coat undercoat and one coat gloss on metal general surfaces
exceeding 300mm girth m2 0.54 6.48 1.68 1.22 9.38 not exceeding 150mm girth m 0.12 1.44 0.28 0.26 1.98 150-300mm girth m 0.18 2.16 0.54 0.41 3.11 isolated areas not exceeding 0.5m2 nr 0.30 3.60 0.82 0.66 5.08 One coat primer, one coat undercoat and one coat gloss on wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.75 9.00 0.65 1.45 11.10 panes area 0.1 to 0.5m2 m2 0.60 7.20 0.50 1.16 8.86 panes area 0.5 to 1m2 m2 0.50 6.00 0.52 0.98 7.50 panes area exceeding 1m2 m2 0.40 4.80 0.45 0.79 6.04 One coat primer, one coat undercoat and one coat gloss on structural steelwork
exceeding 300mm girth m2 0.60 7.20 1.68 1.33 10.21 One coat primer, one coat undercoat and one coat gloss on metal radiators
exceeding 300mm girth m2 0.52 6.24 1.68 1.19 9.11 One coat primer, two coats undercoat and one coat gloss on metal general surfaces
exceeding 300mm girth m2 0.54 6.48 2.23 1.31 10.02 not exceeding 150mm girth m 0.12 1.44 0.28 0.26 1.98 150-300mm girth m 0.18 2.16 0.54 0.41 3.11 isolated areas not exceeding .5m2 nr 0.30 3.60 0.80 0.66 5.06
On external woodwork
One coat primer, two coats undercoat and one coat gloss on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.75 9.00 0.80 1.47 11.27 panes area 0.1 to 0.5m2 m2 0.60 7.20 0.71 1.19 9.10 panes area 0.5 to 1m2 m2 0.50 6.00 0.65 1.00 7.65 panes area exceeding 1m2 m2 0.40 4.80 0.54 0.80 6.14 One coat primer, two coats undercoat and one coat gloss on structural steelwork
exceeding 300mm girth m2 0.78 9.36 2.23 1.74 13.33 One coat primer, two coats undercoat and one coat gloss on metal radiators
exceeding 300mm girth m2 0.72 8.64 2.19 1.62 12.45
One coat primer on wood general surfaces exceeding 300mm girth m2 0.24 2.88 0.54 0.51 3.93 not exceeding 150mm girth m 0.06 0.72 0.09 0.12 0.93 150-300mm girth m 0.08 0.96 0.17 0.17 1.30 isolated areas not exceeding 0.5m2 nr 0.02 0.24 0.26 0.08 0.58 One coat primer on wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.40 4.80 0.19 0.75 5.74 panes area 0.1 to 0.5m2 m2 0.35 4.20 0.17 0.66 5.03 panes area 0.5 to 1m2 m2 0.30 3.60 0.15 0.56 4.31 panes area exceeding 1m2 m2 0.25 3.00 0.13 0.47 3.60
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat primer on wood frames and the like
exceeding 300mm girth m2 0.26 3.12 0.50 0.54 4.16 not exceeding 150mm girth m 0.07 0.84 0.07 0.14 1.05 150-300mm girth m 0.10 1.20 0.15 0.20 1.55 isolated areas not exceeding 0.5m2 nr 0.14 1.68 0.23 0.29 2.20 One coat undercoat on primed wood general surfaces
exceeding 300mm girth m2 0.24 2.88 0.54 0.51 3.93 not exceeding 150mm girth m 0.06 0.72 0.09 0.12 0.93 150-300mm girth m 0.08 0.96 0.17 0.17 1.30
windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.40 4.80 0.21 0.75 5.76 panes area 0.1 to 0.5m2 m2 0.35 4.20 0.19 0.66 5.05 panes area 0.5 to 1m2 m2 0.30 3.60 0.17 0.57 4.34 panes area exceeding 1m2 m2 0.25 3.00 0.15 0.47 3.62 One coat undercoat on primed wood frames and the like
exceeding 300mm girth m2 0.26 3.12 0.54 0.55 4.21 not exceeding 150mm girth m 0.07 0.84 0.09 0.14 1.07 150-300mm girth m 0.10 1.20 0.17 0.21 1.58 isolated areas not exceeding 0.5m2 nr 0.14 1.68 0.26 0.29 2.23
UnitHours Hours £
Mat’ls £
O & P £
Total £
Two coats undercoat on primed wood general surfaces
exceeding 300mm girth m2 0.48 5.76 1.09 1.03 7.88 not exceeding 150mm girth m 0.12 1.44 0.17 0.24 1.85 150-300mm girth m 0.16 1.92 0.34 0.34 2.60 isolated areas not exceeding 0.5m2 nr 0.24 2.88 0.52 0.51 3.91 Two coats undercoat on primed wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.80 9.60 0.43 1.50 11.53 panes area 0.1 to 0.5m2 m2 0.70 8.40 0.39 1.32 10.11 panes area 0.5 to 1m2 m2 0.60 7.20 0.34 1.13 8.67 panes area exceeding 1m2 m2 0.50 6.00 0.30 0.95 7.25 Two coats undercoat on primed wood frames and the like
exceeding 300mm girth m2 0.52 6.24 1.09 1.10 8.43 not exceeding 150mm girth m 0.14 1.68 0.17 0.28 2.13 150-300mm girth m 0.20 2.40 0.34 0.41 3.15 isolated areas not exceeding 0.5m2 nr 0.32 3.84 0.52 0.65 5.01 One coat gloss on undercoated wood general surfaces
exceeding 300mm girth m2 0.24 2.88 0.54 0.51 3.93 not exceeding 150mm girth m 0.06 0.72 0.09 0.12 0.93 150-300mm girth m 0.08 0.96 0.17 0.17 1.30 isolated areas not exceeding 0.5m2 nr 0.12 1.44 0.26 0.26 1.96
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat gloss on undercoated wood
panes area 0.1 to 0.5m2 m2 0.35 4.20 0.09 0.64 4.93 panes area 0.5 to 1m2 m2 0.30 3.60 0.17 0.57 4.34 panes area exceeding 1m2 m2 0.25 3.00 0.15 0.47 3.62 One coat gloss on undercoated wood frames and the like
exceeding 300mm girth m2 0.26 3.12 0.54 0.55 4.21 not exceeding 150mm girth m 0.07 0.84 0.09 0.14 1.07 150-300mm girth m 0.10 1.20 0.17 0.21 1.58 isolated areas not exceeding 0.5m2 nr 0.16 1.92 0.26 0.33 2.51 One coat primer, one coat undercoat and one coat gloss on wood general surfaces
exceeding 300mm girth m2 0.73 8.70 1.63 1.55 11.88 not exceeding 150mm girth m 0.14 1.68 0.26 0.29 2.23 150-300mm girth m 0.24 2.88 0.52 0.51 3.91 isolated areas not exceeding 0.5m2 nr 0.40 4.80 0.78 0.84 6.42 One coat primer, one coat undercoat and one coat gloss on wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 1.20 14.40 0.63 2.25 17.28 panes area 0.1 to 0.5m2 m2 1.05 12.60 0.47 1.96 15.03 panes area 0.5 to 1m2 m2 0.90 10.80 0.50 1.70 13.00 panes area exceeding 1m2 m2 0.75 9.00 0.43 1.41 10.84
UnitHoursHours £
Mat’ls £
O & P £
Total £
One coat primer, one coat undercoat and one coat gloss on wood frames and the like
exceeding 300mm girth m2 0.78 9.36 1.59 1.64 12.59 not exceeding 150mm girth m 0.21 2.52 0.23 0.41 3.16 150-300mm girth m 0.30 3.60 0.50 0.62 4.72 isolated areas not exceeding 0.5m2 nr 0.48 5.76 0.76 0.98 7.50 One coat primer, two coats undercoat and one coat gloss on wood general surfaces
exceeding 300mm girth m2 0.96 11.52 2.18 2.06 15.76 not exceeding 150mm girth m 0.25 3.00 0.34 0.50 3.84 150-300mm girth m 0.34 4.08 0.69 0.72 5.49 isolated areas not exceeding 0.5m2 nr 0.48 5.76 1.04 1.02 7.82 One coat primer, two coats undercoat and one coat gloss on wood windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 1.60 19.20 0.85 3.01 23.06 panes area 0.1 to 0.5m2 m2 1.40 16.80 0.76 2.63 20.19
On external metalwork
One coat primer, two coats undercoat and one coat gloss on wood frames and the like
exceeding 300mm girth m2 1.04 12.48 2.13 2.19 16.80 not exceeding 150mm girth m 0.28 3.36 0.32 0.55 4.23 150-300mm girth m 0.40 4.80 0.67 0.82 6.29 isolated areas not exceeding .5m2 nr 0.64 7.68 1.02 1.31 10.01
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat primer on metal general surfaces
exceeding 300mm girth m2 0.24 2.88 0.59 0.52 3.99 not exceeding 150mm girth m 0.06 0.72 0.11 0.12 0.95 150-300mm girth m 0.08 0.96 0.19 0.17 1.32 isolated areas not exceeding 0.5m2 nr 0.12 1.44 0.30 0.26 2.00 One coat primer on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.40 4.80 0.21 0.75 5.76 panes area 0.1 to 0.5m2 m2 0.35 4.20 0.19 0.66 5.05 panes area 0.5 to 1m2 m2 0.30 3.60 0.17 0.57 4.34 panes area exceeding 1m2 m2 0.25 3.00 0.15 0.47 3.62 One coat primer on structural steelwork exceeding 300mm girth m2 0.30 3.60 0.59 0.63 4.82 One coat primer on pipes and gutters exceeding 300mm girth m2 0.26 3.12 0.59 0.56 4.27 150-300mm girth m 0.08 0.96 0.19 0.17 1.32 One coat undercoat on metal general surfaces
exceeding 300mm girth m2 0.24 2.88 0.54 0.51 3.93 not exceeding 150mm girth m 0.06 0.72 0.09 0.12 0.93 150-300mm girth m 0.08 0.96 0.17 0.17 1.30 isolated areas not exceeding 0.5m2 nr 0.12 1.44 0.26 0.26 1.96
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat undercoat on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.40 4.80 0.19 0.75 5.74 panes area 0.1 to 0.5m2 m2 0.35 4.20 0.17 0.66 5.03
One coat undercoat on structural steelwork
exceeding 300mm girth m2 0.30 3.60 0.54 0.62 4.76 One coat primer on pipes and gutters exceeding 300mm girth m2 0.26 3.12 0.54 0.55 4.21 150-300mm girth m 0.08 0.96 0.17 0.17 1.30 Two coats undercoat on metal general surfaces
exceeding 300mm girth m2 0.48 5.76 1.09 1.03 7.88 not exceeding 150mm girth m 0.12 1.44 0.17 0.24 1.85 150-300mm girth m 0.20 2.40 0.34 0.41 3.15 isolated areas not exceeding 0.5m2 nr 0.24 2.88 0.52 0.51 3.91 Two coats undercoat on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.80 9.60 0.39 1.50 11.49 panes area 0.1 to 0.5m2 m2 0.70 8.40 0.34 1.31 10.05 panes area 0.5 to 1m2 m2 0.60 7.20 0.30 1.13 8.63 panes area exceeding 1m2 m2 0.50 6.00 0.26 0.94 7.20
UnitHours Hours £
Mat’ls £
O & P £
Total £
Two coats undercoat on structural steelwork
exceeding 300mm girth m2 0.60 7.20 1.09 1.24 9.53 Two coats undercoat on pipes and gutters
exceeding 300mm girth m2 0.52 6.24 1.09 1.10 8.43 150-300mm girth m 0.16 1.92 0.34 0.34 2.60 One coat gloss on metal general surfaces exceeding 300mm girth m2 0.24 2.88 0.54 0.51 3.93 not exceeding 150mm girth m 0.06 0.72 0.09 0.12 0.93 150-300mm girth m 0.08 0.96 0.17 0.17 1.30 isolated areas not exceeding 0.5m2 nr 0.12 1.44 0.26 0.26 1.96 One coat gloss on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 0.40 4.80 0.19 0.75 5.74 panes area 0.1 to 0.5m2 m2 0.35 4.20 0.17 0.66 5.03 panes area 0.5 to 1m2 m2 0.30 3.60 0.15 0.56 4.31 panes area exceeding 1m2 m2 0.25 3.00 0.13 0.47 3.60 One coat gloss on structural steelwork exceeding 300mm girth m2 0.30 3.60 0.54 0.62 4.76 One coat gloss on pipes and gutters
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat primer, one coat undercoat and one coat gloss on metal general surfaces
exceeding 300mm girth m2 0.72 8.64 1.68 1.55 11.87 not exceeding 150mm girth m 0.18 2.16 0.28 0.37 2.81 150-300mm girth m 0.24 2.88 0.54 0.51 3.93 isolated areas not exceeding 0.5m2 nr 0.36 4.32 0.82 0.77 5.91 One coat primer, one coat undercoat and one coat gloss on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 1.20 14.40 0.65 2.26 17.31 panes area 0.1 to 0.5m2 m2 1.05 12.60 0.50 1.97 15.07 panes area 0.5 to 1m2 m2 0.90 10.80 0.52 1.70 13.02 panes area exceeding 1m2 m2 0.75 9.00 0.45 1.42 10.87 One coat primer, one coat undercoat and one coat gloss on structural steelwork
exceeding 300mm girth m2 0.90 10.80 1.68 1.87 14.35 One coat primer, one coat undercoat and one coat gloss on pipes and gutters
exceeding 300mm girth m2 0.78 9.36 1.63 1.65 12.64 150-300mm girth m 0.24 2.88 0.58 0.52 3.98
UnitHours Hours £
Mat’ls £
O & P £
Total £
One coat primer, two coats undercoat and one coat gloss on metal general surfaces
exceeding 300mm girth m2 0.96 11.52 2.23 2.06 15.81 not exceeding 150mm girth m 0.24 2.88 0.28 0.47 3.63 150-300mm girth m 0.32 3.84 0.54 0.66 5.04 isolated areas not exceeding 0.5m2 nr 0.48 5.76 0.80 0.98 7.54 One coat primer, two coats undercoat and one coat gloss on metal windows, glazed doors and the like
panes area not exceeding 0.1m2 m2 1.60 19.20 0.80 3.00 23.00 panes area 0.1 to 0.5m2 m2 1.40 16.80 0.71 2.63 20.14 panes area 0.5 to 1m2 m2 1.20 14.40 0.65 2.26 17.31 panes area exceeding 1m2 m2 1.00 12.00 0.54 1.88 14.42 One coat primer, two coats undercoat and one coat gloss on structural steelwork
exceeding 300mm girth m2 1.20 14.40 2.23 2.49 19.12
Wallpapering
exceeding 300mm girth m2 1.04 12.48 2.18 2.20 16.86 150-300mm girth m 0.32 3.84 0.82 0.70 5.36
UnitHours Hours £
Mat’ls £
O & P £
Total £
Prepare, size, apply adhesive, supply and hang paper to plastered walls and columns, butt jointed
lining paper £1.50 per roll m2 0.30 3.60 0.36 0.59 4.55 £2.00 per roll m2 0.30 3.60 0.48 0.61 4.69 £2.50 per roll m2 0.30 3.60 0.59 0.63 4.82 washable paper £2.50 per roll m2 0.30 3.60 0.59 0.63 4.82 £4.00 per roll m2 0.30 3.60 0.94 0.68 5.22 £5.00 per roll m2 0.30 3.60 1.18 0.72 5.50 vinyl paper £4.00 per roll m2 0.30 3.60 0.94 0.68 5.22 £5.00 per roll m2 0.30 3.60 1.18 0.72 5.50 £6.00 per roll m2 0.30 3.60 1.41 0.75 5.76 washable paper £5.00 per roll m2 0.30 3.60 1.18 0.72 5.50 £6.00 per roll m2 0.30 3.60 1.41 0.75 5.76 £7.00 per roll m2 0.30 3.60 1.64 0.79 6.03 hessian paper £7.00 per m2 m2 0.50 6.00 7.70 2.06 15.76 £8.00 per m2 m2 0.50 6.00 8.80 2.22 17.02 £9.00 per m2 m2 0.50 6.00 9.90 2.39 18.29 suede paper £9.00 per m2 m2 0.30 3.60 9.90 2.03 15.53 £10.00 per m2 m2 0.30 3.60 11.00 2.19 16.79 £11.00 per m2 m2 0.30 3.60 12.10 2.36 18.06
UnitHours Hours £
Mat’ls £
O & P £
Total £
Prepare, size, apply adhesive, supply and hang paper to plastered ceilings and columns, butt jointed
lining paper
£2.50 per roll m2 0.35 4.20 0.59 0.72 5.51 washable paper £2.50 per roll m2 0.35 4.20 0.59 0.72 5.51 £4.00 per roll m2 0.35 4.20 0.94 0.77 5.91 £5.00 per roll m2 0.35 4.20 1.18 0.81 6.19 vinyl paper £4.00 per roll m2 0.35 4.20 0.94 0.77 5.91 £5.00 per roll m2 0.35 4.20 1.18 0.81 6.19 £6.00 per roll m2 0.35 4.20 1.41 0.84 6.45 washable paper £5.00 per roll m2 0.35 4.20 1.18 0.81 6.19 £6.00 per roll m2 0.35 4.20 1.41 0.84 6.45 £7.00 per roll m2 0.35 4.20 1.64 0.88 6.72