ABSTRACT

Security and safety concerns, mainly due to grassroots opposition in Italy, have led to the need to implement drastic changes in the Final Design for the construction phase of the new Turin-Lyon rail line. Alternative solutions in the design of the Montcenis Base tun-nel have included a reversal of the mechanized excavation direction in favour of a downhill path; a reduction of the space available for the main construction site, and a particularly com-plex logistical setup. Faced with these challenges, the classic design approach has been over-turned in order to convert constrains into opportunities for the project, especially for the local regions and the environment. These opportunities include a reduction in the use of soil, an in-crease in the proportion of the excavation conducted with mechanized means, and a wholly underground handling of “green” (asbestos-containing) rocks.