ABSTRACT

Recently, an introduction of performance-based design into infrastructure is on process. It means that, in pile foundation, we have to examine not only bearing capacity, but also displacements occurring in usual time and in emergency time. For performance-based design of pile foundation, it is necessary to develop practical prediction method for long-term displacements of pile foundation.