ABSTRACT

Studies for a tunnelling project will be required on a number of different aspects affecting construction and operation. The operational requirements (Chapter 2) will determine the aspects in which operational studies will be needed. For example, operational studies will provide estimates of demand for the project, criteria to establish viability in terms of cost and revenue, social benefits and other aspects which may be selected to be tested against the several options-including that of ‘do nothing’.