ABSTRACT

The paper describes an approach for a geotechnical reliability analysis problem in a real life project in 2007. For an LNG terminal to be built in the Port of Rotterdam, hydraulic sand filling was used to extend an existing artificial terrain in order to create space for 4 large LNG tanks (Fig. 1).